美国净水法案第四部分

发布者:系统管理员发布时间:2011-07-03浏览次数:149

SUBCHAPTER IV―PERMITS AND LICENSES

 

§1341. Certification

(a) Compliance with applicable requirements; application; procedures; license suspension

(1) Any applicant for a Federal license or permit to conduct any activity including, but not limited to, the construction or operation of facilities, which may result in any discharge into the navigable waters, shall provide the licensing or permitting agency a certification from the State in which the discharge originates or will originate, or, if appropriate, from the interstate water pollution control agency having jurisdiction over the navigable waters at the point where the discharge originates or will originate, that any such discharge will comply with the applicable provisions of sections 1311, 1312, 1313, 1316, and 1317 of this title. In the case of any such activity for which there is not an applicable effluent limitation or other limitation under sections 1311 (b) and 1312 of this title, and there is not an applicable standard under sections 1316 and 1317 of this title, the State shall so certify, except that any such certification shall not be deemed to satisfy section 1371 (c) of this title. Such State or interstate agency shall establish procedures for public notice in the case of all applications for certification by it and, to the extent it deems appropriate, procedures for public hearings in connection with specific applications. In any case where a State or interstate agency has no authority to give such a certification, such certification shall be from the Administrator. If the State, interstate agency, or Administrator, as the case may be, fails or refuses to act on a request for certification, within a reasonable period of time (which shall not exceed one year) after receipt of such request, the certification requirements of this subsection shall be waived with respect to such Federal application. No license or permit shall be granted until the certification required by this section has been obtained or has been waived as provided in the preceding sentence. No license or permit shall be granted if certification has been denied by the State, interstate agency, or the Administrator, as the case may be.

(2) Upon receipt of such application and certification the licensing or permitting agency shall immediately notify the Administrator of such application and certification. Whenever such a discharge may affect, as determined by the Administrator, the quality of the waters of any other State, the Administrator within thirty days of the date of notice of application for such Federal license or permit shall so notify such other State, the licensing or permitting agency, and the applicant. If, within sixty days after receipt of such notification, such other State determines that such discharge will affect the quality of its waters so as to violate any water quality requirements in such State, and within such sixty-day period notifies the Administrator and the licensing or permitting agency in writing of its objection to the issuance of such license or permit and requests a public hearing on such objection, the licensing or permitting agency shall hold such a hearing. The Administrator shall at such hearing submit his evaluation and recommendations with respect to any such objection to the licensing or permitting agency. Such agency, based upon the recommendations of such State, the Administrator, and upon any additional evidence, if any, presented to the agency at the hearing, shall condition such license or permit in such manner as may be necessary to insure compliance with applicable water quality requirements. If the imposition of conditions cannot insure such compliance such agency shall not issue such license or permit.

(3) The certification obtained pursuant to paragraph (1) of this subsection with respect to the construction of any facility shall fulfill the requirements of this subsection with respect to certification in connection with any other Federal license or permit required for the operation of such facility unless, after notice to the certifying State, agency, or Administrator, as the case may be, which shall be given by the Federal agency to whom application is made for such operating license or permit, the State, or if appropriate, the interstate agency or the Administrator, notifies such agency within sixty days after receipt of such notice that there is no longer reasonable assurance that there will be compliance with the applicable provisions of sections 1311, 1312, 1313, 1316, and 1317 of this title because of changes since the construction license or permit certification was issued in

(A) the construction or operation of the facility,

(B) the characteristics of the waters into which such discharge is made,

(C) the water quality criteria applicable to such waters or

(D) applicable effluent limitations or other requirements. This paragraph shall be inapplicable in any case where the applicant for such operating license or permit has failed to provide the certifying State, or, if appropriate, the interstate agency or the Administrator, with notice of any proposed changes in the construction or operation of the facility with respect to which a construction license or permit has been granted, which changes may result in violation of section 1311, 1312, 1313, 1316, or 1317 of this title.

(4) Prior to the initial operation of any federally licensed or permitted facility or activity which may result in any discharge into the navigable waters and with respect to which a certification has been obtained pursuant to paragraph (1) of this subsection, which facility or activity is not subject to a Federal operating license or permit, the licensee or permittee shall provide an opportunity for such certifying State, or, if appropriate, the interstate agency or the Administrator to review the manner in which the facility or activity shall be operated or conducted for the purposes of assuring that applicable effluent limitations or other limitations or other applicable water quality requirements will not be violated. Upon notification by the certifying State, or if appropriate, the interstate agency or the Administrator that the operation of any such federally licensed or permitted facility or activity will violate applicable effluent limitations or other limitations or other water quality requirements such Federal agency may, after public hearing, suspend such license or permit. If such license or permit is suspended, it shall remain suspended until notification is received from the certifying State, agency, or Administrator, as the case may be, that there is reasonable assurance that such facility or activity will not violate the applicable provisions of section 1311, 1312, 1313, 1316, or 1317 of this title.

(5) Any Federal license or permit with respect to which a certification has been obtained under paragraph (1) of this subsection may be suspended or revoked by the Federal agency issuing such license or permit upon the entering of a judgment under this chapter that such facility or activity has been operated in violation of the applicable provisions of section 1311, 1312, 1313, 1316, or 1317 of this title.

(6) Except with respect to a permit issued under section 1342 of this title, in any case where actual construction of a facility has been lawfully commenced prior to April 3, 1970, no certification shall be required under this subsection for a license or permit issued after April 3, 1970, to operate such facility, except that any such license or permit issued without certification shall terminate April 3, 1973, unless prior to such termination date the person having such license or permit submits to the Federal agency which issued such license or permit a certification and otherwise meets the requirements of this section.

(b) Compliance with other provisions of law setting applicable water quality requirements

Nothing in this section shall be construed to limit the authority of any department or agency pursuant to any other provision of law to require compliance with any applicable water quality requirements. The Administrator shall, upon the request of any Federal department or agency, or State or interstate agency, or applicant, provide, for the purpose of this section, any relevant information on applicable effluent limitations, or other limitations, standards, regulations, or requirements, or water quality criteria, and shall, when requested by any such department or agency or State or interstate agency, or applicant, comment on any methods to comply with such limitations, standards, regulations, requirements, or criteria.

(c) Authority of Secretary of the Army to permit use of spoil disposal areas by Federal licensees or permittees

In order to implement the provisions of this section, the Secretary of the Army, acting through the Chief of Engineers, is authorized, if he deems it to be in the public interest, to permit the use of spoil disposal areas under his jurisdiction by Federal licensees or permittees, and to make an appropriate charge for such use. Moneys received from such licensees or permittees shall be deposited in the Treasury as miscellaneous receipts.

(d) Limitations and monitoring requirements of certification

Any certification provided under this section shall set forth any effluent limitations and other limitations, and monitoring requirements necessary to assure that any applicant for a Federal license or permit will comply with any applicable effluent limitations and other limitations, under section 1311 or 1312 of this title, standard of performance under section 1316 of this title, or prohibition, effluent standard, or pretreatment standard under section 1317 of this title, and with any other appropriate requirement of State law set forth in such certification, and shall become a condition on any Federal license or permit subject to the provisions of this section.

§1342. National pollutant discharge elimination system

(a) Permits for discharge of pollutants

(1) Except as provided in sections 1328 and 1344 of this title, the Administrator may, after opportunity for public hearing issue a permit for the discharge of any pollutant, or combination of pollutants, notwithstanding section 1311 (a) of this title, upon condition that such discharge will meet either

(A) all applicable requirements under sections 1311, 1312, 1316, 1317, 1318, and 1343 of this title, or

(B) prior to the taking of necessary implementing actions relating to all such requirements, such conditions as the Administrator determines are necessary to carry out the provisions of this chapter.

(2) The Administrator shall prescribe conditions for such permits to assure compliance with the requirements of paragraph (1) of this subsection, including conditions on data and information collection, reporting, and such other requirements as he deems appropriate.

(3) The permit program of the Administrator under paragraph (1) of this subsection, and permits issued thereunder, shall be subject to the same terms, conditions, and requirements as apply to a State permit program and permits issued thereunder under subsection (b) of this section.

(4) All permits for discharges into the navigable waters issued pursuant to section 407 of this title shall be deemed to be permits issued under this subchapter, and permits issued under this subchapter shall be deemed to be permits issued under section 407 of this title, and shall continue in force and effect for their term unless revoked, modified, or suspended in accordance with the provisions of this chapter.

(5) No permit for a discharge into the navigable waters shall be issued under section 407 of this title after October 18, 1972. Each application for a permit under section 407 of this title, pending on October 18, 1972, shall be deemed to be an application for a permit under this section. The Administrator shall authorize a State, which he determines has the capability of administering a permit program which will carry out the objectives of this chapter to issue permits for discharges into the navigable waters within the jurisdiction of such State. The Administrator may exercise the authority granted him by the preceding sentence only during the period which begins on October 18, 1972, and ends either on the ninetieth day after the date of the first promulgation of guidelines required by section 1314 (i)(2) of this title, or the date of approval by the Administrator of a permit program for such State under subsection (b) of this section, whichever date first occurs, and no such authorization to a State shall extend beyond the last day of such period. Each such permit shall be subject to such conditions as the Administrator determines are necessary to carry out the provisions of this chapter. No such permit shall issue if the Administrator objects to such issuance.

(b) State permit programs

At any time after the promulgation of the guidelines required by subsection (i)(2) of section 1314 of this title, the Governor of each State desiring to administer its own permit program for discharges into navigable waters within its jurisdiction may submit to the Administrator a full and complete description of the program it proposes to establish and administer under State law or under an interstate compact. In addition, such State shall submit a statement from the attorney general (or the attorney for those State water pollution control agencies which have independent legal counsel), or from the chief legal officer in the case of an interstate agency, that the laws of such State, or the interstate compact, as the case may be, provide adequate authority to carry out the described program. The Administrator shall approve each submitted program unless he determines that adequate authority does not exist:

(1) To issue permits which―

(A) apply, and insure compliance with, any applicable requirements of sections 1311, 1312, 1316, 1317, and 1343 of this title;

(B) are for fixed terms not exceeding five years; and

(C) can be terminated or modified for cause including, but not limited to, the following:

(i) violation of any condition of the permit;

(ii) obtaining a permit by misrepresentation, or failure to disclose fully all relevant facts;

(iii) change in any condition that requires either a temporary or permanent reduction or elimination of the permitted discharge;

(D) control the disposal of pollutants into wells;

(2)

(A) To issue permits which apply, and insure compliance with, all applicable requirements of section 1318 of this title; or

(B) To inspect, monitor, enter, and require reports to at least the same extent as required in section 1318 of this title;

(3) To insure that the public, and any other State the waters of which may be affected, receive notice of each application for a permit and to provide an opportunity for public hearing before a ruling on each such application;

(4) To insure that the Administrator receives notice of each application (including a copy thereof) for a permit;

(5) To insure that any State (other than the permitting State), whose waters may be affected by the issuance of a permit may submit written recommendations to the permitting State (and the Administrator) with respect to any permit application and, if any part of such written recommendations are not accepted by the permitting State, that the permitting State will notify such affected State (and the Administrator) in writing of its failure to so accept such recommendations together with its reasons for so doing;

(6) To insure that no permit will be issued if, in the judgment of the Secretary of the Army acting through the Chief of Engineers, after consultation with the Secretary of the department in which the Coast Guard is operating, anchorage and navigation of any of the navigable waters would be substantially impaired thereby;

(7) To abate violations of the permit or the permit program, including civil and criminal penalties and other ways and means of enforcement;

(8) To insure that any permit for a discharge from a publicly owned treatment works includes conditions to require the identification in terms of character and volume of pollutants of any significant source introducing pollutants subject to pretreatment standards under section 1317 (b) of this title into such works and a program to assure compliance with such pretreatment standards by each such source, in addition to adequate notice to the permitting agency of

(A) new introductions into such works of pollutants from any source which would be a new source as defined in section 1316 of this title if such source were discharging pollutants,

(B) new introductions of pollutants into such works from a source which would be subject to section 1311 of this title if it were discharging such pollutants, or

(C) a substantial change in volume or character of pollutants being introduced into such works by a source introducing pollutants into such works at the time of issuance of the permit. Such notice shall include information on the quality and quantity of effluent to be introduced into such treatment works and any anticipated impact of such change in the quantity or quality of effluent to be discharged from such publicly owned treatment works; and

(9) To insure that any industrial user of any publicly owned treatment works will comply with sections 1284 (b), 1317, and 1318 of this title.

(c) Suspension of Federal program upon submission of State program; withdrawal of approval of State program; return of State program to Administrator

(1) Not later than ninety days after the date on which a State has submitted a program (or revision thereof) pursuant to subsection (b) of this section, the Administrator shall suspend the issuance of permits under subsection (a) of this section as to those discharges subject to such program unless he determines that the State permit program does not meet the requirements of subsection (b) of this section or does not conform to the guidelines issued under section 1314 (i)(2) of this title. If the Administrator so determines, he shall notify the State of any revisions or modifications necessary to conform to such requirements or guidelines.

(2) Any State permit program under this section shall at all times be in accordance with this section and guidelines promulgated pursuant to section 1314 (i)(2) of this title.

(3) Whenever the Administrator determines after public hearing that a State is not administering a program approved under this section in accordance with requirements of this section, he shall so notify the State and, if appropriate corrective action is not taken within a reasonable time, not to exceed ninety days, the Administrator shall withdraw approval of such program. The Administrator shall not withdraw approval of any such program unless he shall first have notified the State, and made public, in writing, the reasons for such withdrawal.

(4) Limitations on partial permit program returns and withdrawals.― A State may return to the Administrator administration, and the Administrator may withdraw under paragraph (3) of this subsection approval, of―

(A) a State partial permit program approved under subsection (n)(3) of this section only if the entire permit program being administered by the State department or agency at the time is returned or withdrawn; and

(B) a State partial permit program approved under subsection (n)(4) of this section only if an entire phased component of the permit program being administered by the State at the time is returned or withdrawn.

(d) Notification of Administrator

(1) Each State shall transmit to the Administrator a copy of each permit application received by such State and provide notice to the Administrator of every action related to the consideration of such permit application, including each permit proposed to be issued by such State.

(2) No permit shall issue

(A) if the Administrator within ninety days of the date of his notification under subsection (b)(5) of this section objects in writing to the issuance of such permit, or

(B) if the Administrator within ninety days of the date of transmittal of the proposed permit by the State objects in writing to the issuance of such permit as being outside the guidelines and requirements of this chapter. Whenever the Administrator objects to the issuance of a permit under this paragraph such written objection shall contain a statement of the reasons for such objection and the effluent limitations and conditions which such permit would include if it were issued by the Administrator.

(3) The Administrator may, as to any permit application, waive paragraph (2) of this subsection.

(4) In any case where, after December 27, 1977, the Administrator, pursuant to paragraph (2) of this subsection, objects to the issuance of a permit, on request of the State, a public hearing shall be held by the Administrator on such objection. If the State does not resubmit such permit revised to meet such objection within 30 days after completion of the hearing, or, if no hearing is requested within 90 days after the date of such objection, the Administrator may issue the permit pursuant to subsection (a) of this section for such source in accordance with the guidelines and requirements of this chapter.

(e) Waiver of notification requirement

In accordance with guidelines promulgated pursuant to subsection (i)(2) of section 1314 of this title, the Administrator is authorized to waive the requirements of subsection (d) of this section at the time he approves a program pursuant to subsection (b) of this section for any category (including any class, type, or size within such category) of point sources within the State submitting such program.

(f) Point source categories

The Administrator shall promulgate regulations establishing categories of point sources which he determines shall not be subject to the requirements of subsection (d) of this section in any State with a program approved pursuant to subsection (b) of this section. The Administrator may distinguish among classes, types, and sizes within any category of point sources.

(g) Other regulations for safe transportation, handling, carriage, storage, and stowage of pollutants

Any permit issued under this section for the discharge of pollutants into the navigable waters from a vessel or other floating craft shall be subject to any applicable regulations promulgated by the Secretary of the department in which the Coast Guard is operating, establishing specifications for safe transportation, handling, carriage, storage, and stowage of pollutants.

(h) Violation of permit conditions; restriction or prohibition upon introduction of pollutant by source not previously utilizing treatment works

In the event any condition of a permit for discharges from a treatment works (as defined in section 1292 of this title) which is publicly owned is violated, a State with a program approved under subsection (b) of this section or the Administrator, where no State program is approved or where the Administrator determines pursuant to section 1319 (a) of this title that a State with an approved program has not commenced appropriate enforcement action with respect to such permit, may proceed in a court of competent jurisdiction to restrict or prohibit the introduction of any pollutant into such treatment works by a source not utilizing such treatment works prior to the finding that such condition was violated.

(i) Federal enforcement not limited

Nothing in this section shall be construed to limit the authority of the Administrator to take action pursuant to section 1319 of this title.

(j) Public information

A copy of each permit application and each permit issued under this section shall be available to the public. Such permit application or permit, or portion thereof, shall further be available on request for the purpose of reproduction.

(k) Compliance with permits

Compliance with a permit issued pursuant to this section shall be deemed compliance, for purposes of sections 1319 and 1365 of this title, with sections 1311, 1312, 1316, 1317, and 1343 of this title, except any standard imposed under section 1317 of this title for a toxic pollutant injurious to human health. Until December 31, 1974, in any case where a permit for discharge has been applied for pursuant to this section, but final administrative disposition of such application has not been made, such discharge shall not be a violation of

(1) section 1311, 1316, or 1342 of this title, or

(2) section 407 of this title, unless the Administrator or other plaintiff proves that final administrative disposition of such application has not been made because of the failure of the applicant to furnish information reasonably required or requested in order to process the application. For the 180-day period beginning on October 18, 1972, in the case of any point source discharging any pollutant or combination of pollutants immediately prior to such date which source is not subject to section 407 of this title, the discharge by such source shall not be a violation of this chapter if such a source applies for a permit for discharge pursuant to this section within such 180-day period.

(l) Limitation on permit requirement

(1) Agricultural return flows

The Administrator shall not require a permit under this section for discharges composed entirely of return flows from irrigated agriculture, nor shall the Administrator directly or indirectly, require any State to require such a permit.

(2) Stormwater runoff from oil, gas, and mining operations

The Administrator shall not require a permit under this section, nor shall the Administrator directly or indirectly require any State to require a permit, for discharges of stormwater runoff from mining operations or oil and gas exploration, production, processing, or treatment operations or transmission facilities, composed entirely of flows which are from conveyances or systems of conveyances (including but not limited to pipes, conduits, ditches, and channels) used for collecting and conveying precipitation runoff and which are not contaminated by contact with, or do not come into contact with, any overburden, raw material, intermediate products, finished product, byproduct, or waste products located on the site of such operations.

(m) Additional pretreatment of conventional pollutants not required

To the extent a treatment works (as defined in section 1292 of this title) which is publicly owned is not meeting the requirements of a permit issued under this section for such treatment works as a result of inadequate design or operation of such treatment works, the Administrator, in issuing a permit under this section, shall not require pretreatment by a person introducing conventional pollutants identified pursuant to section 1314 (a)(4) of this title into such treatment works other than pretreatment required to assure compliance with pretreatment standards under subsection (b)(8) of this section and section 1317 (b)(1) of this title. Nothing in this subsection shall affect the Administrator’s authority under sections 1317 and 1319 of this title, affect State and local authority under sections 1317 (b)(4) and 1370 of this title, relieve such treatment works of its obligations to meet requirements established under this chapter, or otherwise preclude such works from pursuing whatever feasible options are available to meet its responsibility to comply with its permit under this section.

(n) Partial permit program

(1) State submission

The Governor of a State may submit under subsection (b) of this section a permit program for a portion of the discharges into the navigable waters in such State.

(2) Minimum coverage

A partial permit program under this subsection shall cover, at a minimum, administration of a major category of the discharges into the navigable waters of the State or a major component of the permit program required by subsection (b) of this section.

(3) Approval of major category partial permit programs

The Administrator may approve a partial permit program covering administration of a major category of discharges under this subsection if―

(A) such program represents a complete permit program and covers all of the discharges under the jurisdiction of a department or agency of the State; and

(B) the Administrator determines that the partial program represents a significant and identifiable part of the State program required by subsection (b) of this section.

(4) Approval of major component partial permit programs

The Administrator may approve under this subsection a partial and phased permit program covering administration of a major component (including discharge categories) of a State permit program required by subsection (b) of this section if―

(A) the Administrator determines that the partial program represents a significant and identifiable part of the State program required by subsection (b) of this section; and

(B) the State submits, and the Administrator approves, a plan for the State to assume administration by phases of the remainder of the State program required by subsection (b) of this section by a specified date not more than 5 years after submission of the partial program under this subsection and agrees to make all reasonable efforts to assume such administration by such date.

(o) Anti-backsliding

(1) General prohibition

In the case of effluent limitations established on the basis of subsection (a)(1)(B) of this section, a permit may not be renewed, reissued, or modified on the basis of effluent guidelines promulgated under section 1314 (b) of this title subsequent to the original issuance of such permit, to contain effluent limitations which are less stringent than the comparable effluent limitations in the previous permit. In the case of effluent limitations established on the basis of section 1311 (b)(1)(C) or section 1313 (d) or (e) of this title, a permit may not be renewed, reissued, or modified to contain effluent limitations which are less stringent than the comparable effluent limitations in the previous permit except in compliance with section 1313 (d)(4) of this title.

(2) Exceptions

A permit with respect to which paragraph (1) applies may be renewed, reissued, or modified to contain a less stringent effluent limitation applicable to a pollutant if―

(A) material and substantial alterations or additions to the permitted facility occurred after permit issuance which justify the application of a less stringent effluent limitation;

(B)

(i) information is available which was not available at the time of permit issuance (other than revised regulations, guidance, or test methods) and which would have justified the application of a less stringent effluent limitation at the time of permit issuance; or

(ii) the Administrator determines that technical mistakes or mistaken interpretations of law were made in issuing the permit under subsection (a)(1)(B) of this section;

(C) a less stringent effluent limitation is necessary because of events over which the permittee has no control and for which there is no reasonably available remedy;

(D) the permittee has received a permit modification under section 1311 (c), 1311 (g), 1311 (h), 1311 (i), 1311 (k), 1311 (n), or 1326 (a) of this title; or

(E) the permittee has installed the treatment facilities required to meet the effluent limitations in the previous permit and has properly operated and maintained the facilities but has nevertheless been unable to achieve the previous effluent limitations, in which case the limitations in the reviewed, reissued, or modified permit may reflect the level of pollutant control actually achieved (but shall not be less stringent than required by effluent guidelines in effect at the time of permit renewal, reissuance, or modification).

Subparagraph (B) shall not apply to any revised waste load allocations or any alternative grounds for translating water quality standards into effluent limitations, except where the cumulative effect of such revised allocations results in a decrease in the amount of pollutants discharged into the concerned waters, and such revised allocations are not the result of a discharger eliminating or substantially reducing its discharge of pollutants due to complying with the requirements of this chapter or for reasons otherwise unrelated to water quality.

(3) Limitations

In no event may a permit with respect to which paragraph (1) applies be renewed, reissued, or modified to contain an effluent limitation which is less stringent than required by effluent guidelines in effect at the time the permit is renewed, reissued, or modified. In no event may such a permit to discharge into waters be renewed, reissued, or modified to contain a less stringent effluent limitation if the implementation of such limitation would result in a violation of a water quality standard under section 1313 of this title applicable to such waters.

(p) Municipal and industrial stormwater discharges

(1) General rule

Prior to October 1, 1994, the Administrator or the State (in the case of a permit program approved under this section) shall not require a permit under this section for discharges composed entirely of stormwater.

(2) Exceptions

Paragraph (1) shall not apply with respect to the following stormwater discharges:

(A) A discharge with respect to which a permit has been issued under this section before February 4, 1987.

(B) A discharge associated with industrial activity.

(C) A discharge from a municipal separate storm sewer system serving a population of 250,000 or more.

(D) A discharge from a municipal separate storm sewer system serving a population of 100,000 or more but less than 250,000.

(E) A discharge for which the Administrator or the State, as the case may be, determines that the stormwater discharge contributes to a violation of a water quality standard or is a significant contributor of pollutants to waters of the United States.

(3) Permit requirements

(A) Industrial discharges

Permits for discharges associated with industrial activity shall meet all applicable provisions of this section and section 1311 of this title.

(B) Municipal discharge

Permits for discharges from municipal storm sewers―

(i) may be issued on a system- or jurisdiction-wide basis;

(ii) shall include a requirement to effectively prohibit non-stormwater discharges into the storm sewers; and

(iii) shall require controls to reduce the discharge of pollutants to the maximum extent practicable, including management practices, control techniques and system, design and engineering methods, and such other provisions as the Administrator or the State determines appropriate for the control of such pollutants.

(4) Permit application requirements

(A) Industrial and large municipal discharges

Not later than 2 years after February 4, 1987, the Administrator shall establish regulations setting forth the permit application requirements for stormwater discharges described in paragraphs (2)(B) and (2)(C). Applications for permits for such discharges shall be filed no later than 3 years after February 4, 1987. Not later than 4 years after February 4, 1987, the Administrator or the State, as the case may be, shall issue or deny each such permit. Any such permit shall provide for compliance as expeditiously as practicable, but in no event later than 3 years after the date of issuance of such permit.

(B) Other municipal discharges

Not later than 4 years after February 4, 1987, the Administrator shall establish regulations setting forth the permit application requirements for stormwater discharges described in paragraph (2)(D). Applications for permits for such discharges shall be filed no later than 5 years after February 4, 1987. Not later than 6 years after February 4, 1987, the Administrator or the State, as the case may be, shall issue or deny each such permit. Any such permit shall provide for compliance as expeditiously as practicable, but in no event later than 3 years after the date of issuance of such permit.

(5) Studies

The Administrator, in consultation with the States, shall conduct a study for the purposes of―

(A) identifying those stormwater discharges or classes of stormwater discharges for which permits are not required pursuant to paragraphs (1) and (2) of this subsection;

(B) determining, to the maximum extent practicable, the nature and extent of pollutants in such discharges; and

(C) establishing procedures and methods to control stormwater discharges to the extent necessary to mitigate impacts on water quality.

Not later than October 1, 1988, the Administrator shall submit to Congress a report on the results of the study described in subparagraphs (A) and (B). Not later than October 1, 1989, the Administrator shall submit to Congress a report on the results of the study described in subparagraph (C).

(6) Regulations

Not later than October 1, 1993, the Administrator, in consultation with State and local officials, shall issue regulations (based on the results of the studies conducted under paragraph (5)) which designate stormwater discharges, other than those discharges described in paragraph (2), to be regulated to protect water quality and shall establish a comprehensive program to regulate such designated sources. The program shall, at a minimum,

(A) establish priorities,

(B) establish requirements for State stormwater management programs, and

(C) establish expeditious deadlines. The program may include performance standards, guidelines, guidance, and management practices and treatment requirements, as appropriate.

(q) Combined sewer overflows

(1) Requirement for permits, orders, and decrees

Each permit, order, or decree issued pursuant to this chapter after December 21, 2000, for a discharge from a municipal combined storm and sanitary sewer shall conform to the Combined Sewer Overflow Control Policy signed by the Administrator on April 11, 1994 (in this subsection referred to as the “CSO control policy”).

(2) Water quality and designated use review guidance

Not later than July 31, 2001, and after providing notice and opportunity for public comment, the Administrator shall issue guidance to facilitate the conduct of water quality and designated use reviews for municipal combined sewer overflow receiving waters.

(3) Report

Not later than September 1, 2001, the Administrator shall transmit to Congress a report on the progress made by the Environmental Protection Agency, States, and municipalities in implementing and enforcing the CSO control policy.

§1343. Ocean discharge criteria

(a) Issuance of permits

No permit under section 1342 of this title for a discharge into the territorial sea, the waters of the contiguous zone, or the oceans shall be issued, after promulgation of guidelines established under subsection (c) of this section, except in compliance with such guidelines. Prior to the promulgation of such guidelines, a permit may be issued under such section 1342 of this title if the Administrator determines it to be in the public interest.

(b) Waiver

The requirements of subsection (d) of section 1342 of this title may not be waived in the case of permits for discharges into the territorial sea.

(c) Guidelines for determining degradation of waters

(1) The Administrator shall, within one hundred and eighty days after October 18, 1972 (and from time to time thereafter), promulgate guidelines for determining the degradation of the waters of the territorial seas, the contiguous zone, and the oceans, which shall include:

(A) the effect of disposal of pollutants on human health or welfare, including but not limited to plankton, fish, shellfish, wildlife, shorelines, and beaches;

(B) the effect of disposal of pollutants on marine life including the transfer, concentration, and dispersal of pollutants or their byproducts through biological, physical, and chemical processes; changes in marine ecosystem diversity, productivity, and stability; and species and community population changes;

(C) the effect of disposal, of pollutants on esthetic, recreation, and economic values;

(D) the persistence and permanence of the effects of disposal of pollutants;

(E) the effect of the disposal of varying rates, of particular volumes and concentrations of pollutants;

(F) other possible locations and methods of disposal or recycling of pollutants including land-based alternatives; and

(G) the effect on alternate uses of the oceans, such as mineral exploitation and scientific study.

(2) In any event where insufficient information exists on any proposed discharge to make a reasonable judgment on any of the guidelines established pursuant to this subsection no permit shall be issued under section 1342 of this title.

§1344. Permits for dredged or fill material

(a) Discharge into navigable waters at specified disposal sites

The Secretary may issue permits, after notice and opportunity for public hearings for the discharge of dredged or fill material into the navigable waters at specified disposal sites. Not later than the fifteenth day after the date an applicant submits all the information required to complete an application for a permit under this subsection, the Secretary shall publish the notice required by this subsection.

(b) Specification for disposal sites

Subject to subsection (c) of this section, each such disposal site shall be specified for each such permit by the Secretary

(1) through the application of guidelines developed by the Administrator, in conjunction with the Secretary, which guidelines shall be based upon criteria comparable to the criteria applicable to the territorial seas, the contiguous zone, and the ocean under section 1343 (c) of this title, and

(2) in any case where such guidelines under clause (1) alone would prohibit the specification of a site, through the application additionally of the economic impact of the site on navigation and anchorage.

(c) Denial or restriction of use of defined areas as disposal sites

The Administrator is authorized to prohibit the specification (including the withdrawal of specification) of any defined area as a disposal site, and he is authorized to deny or restrict the use of any defined area for specification (including the withdrawal of specification) as a disposal site, whenever he determines, after notice and opportunity for public hearings, that the discharge of such materials into such area will have an unacceptable adverse effect on municipal water supplies, shellfish beds and fishery areas (including spawning and breeding areas), wildlife, or recreational areas. Before making such determination, the Administrator shall consult with the Secretary. The Administrator shall set forth in writing and make public his findings and his reasons for making any determination under this subsection.

(d) “Secretary” defined

The term “Secretary” as used in this section means the Secretary of the Army, acting through the Chief of Engineers.

(e) General permits on State, regional, or nationwide basis

(1) In carrying out his functions relating to the discharge of dredged or fill material under this section, the Secretary may, after notice and opportunity for public hearing, issue general permits on a State, regional, or nationwide basis for any category of activities involving discharges of dredged or fill material if the Secretary determines that the activities in such category are similar in nature, will cause only minimal adverse environmental effects when performed separately, and will have only minimal cumulative adverse effect on the environment. Any general permit issued under this subsection shall

(A) be based on the guidelines described in subsection (b)(1) of this section, and

(B) set forth the requirements and standards which shall apply to any activity authorized by such general permit.

(2) No general permit issued under this subsection shall be for a period of more than five years after the date of its issuance and such general permit may be revoked or modified by the Secretary if, after opportunity for public hearing, the Secretary determines that the activities authorized by such general permit have an adverse impact on the environment or such activities are more appropriately authorized by individual permits.

(f) Non-prohibited discharge of dredged or fill ma­terial

(1) Except as provided in paragraph (2) of this subsection, the discharge of dredged or fill material―

(A) from normal farming, silviculture, and ranching activities such as plowing, seeding, cultivating, minor drainage, harvesting for the production of food, fiber, and forest products, or upland soil and water conservation practices;

(B) for the purpose of maintenance, including emergency reconstruction of recently damaged parts, of currently serviceable structures such as dikes, dams, levees, groins, riprap, breakwaters, causeways, and bridge abutments or approaches, and transportation structures;

(C) for the purpose of construction or maintenance of farm or stock ponds or irrigation ditches, or the maintenance of drainage ditches;

(D) for the purpose of construction of temporary sedimentation basins on a construction site which does not include placement of fill material into the navigable waters;

(E) for the purpose of construction or maintenance of farm roads or forest roads, or temporary roads for moving mining equipment, where such roads are constructed and maintained, in accordance with best management practices, to assure that flow and circulation patterns and chemical and biological characteristics of the navigable waters are not impaired, that the reach of the navigable waters is not reduced, and that any adverse effect on the aquatic environment will be otherwise minimized;

(F) resulting from any activity with respect to which a State has an approved program under section 1288 (b)(4) of this title which meets the requirements of subparagraphs (B) and (C) of such section,

is not prohibited by or otherwise subject to regulation under this section or section 1311 (a) or 1342 of this title (except for effluent standards or prohibitions under section 1317 of this title).

(2) Any discharge of dredged or fill material into the navigable waters incidental to any activity having as its purpose bringing an area of the navigable waters into a use to which it was not previously subject, where the flow or circulation of navigable waters may be impaired or the reach of such waters be reduced, shall be required to have a permit under this section.

(g) State administration

(1) The Governor of any State desiring to administer its own individual and general permit program for the discharge of dredged or fill material into the navigable waters (other than those waters which are presently used, or are susceptible to use in their natural condition or by reasonable improvement as a means to transport interstate or foreign commerce shoreward to their ordinary high water mark, including all waters which are subject to the ebb and flow of the tide shoreward to their mean high water mark, or mean higher high water mark on the west coast, including wetlands adjacent thereto) within its jurisdiction may submit to the Administrator a full and complete description of the program it proposes to establish and administer under State law or under an interstate compact. In addition, such State shall submit a statement from the attorney general (or the attorney for those State agencies which have independent legal counsel), or from the chief legal officer in the case of an interstate agency, that the laws of such State, or the interstate compact, as the case may be, provide adequate authority to carry out the described program.

(2) Not later than the tenth day after the date of the receipt of the program and statement submitted by any State under paragraph (1) of this subsection, the Administrator shall provide copies of such program and statement to the Secretary and the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service.

(3) Not later than the ninetieth day after the date of the receipt by the Administrator of the program and statement submitted by any State, under paragraph (1) of this subsection, the Secretary and the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service, shall submit any comments with respect to such program and statement to the Administrator in writing.

(h) Determination of State’s authority to issue permits under State program; approval; notification; transfers to State program

(1) Not later than the one-hundred-twentieth day after the date of the receipt by the Administrator of a program and statement submitted by any State under paragraph (1) of this subsection, the Administrator shall determine, taking into account any comments submitted by the Secretary and the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service, pursuant to subsection (g) of this section, whether such State has the following authority with respect to the issuance of permits pursuant to such program:

(A) To issue permits which―

(i) apply, and assure compliance with, any applicable requirements of this section, including, but not limited to, the guidelines established under subsection (b)(1) of this section, and sections 1317 and 1343 of this title;

(ii) are for fixed terms not exceeding five years; and

(iii) can be terminated or modified for cause including, but not limited to, the following:

(I) violation of any condition of the permit;

(II) obtaining a permit by misrepresentation, or failure to disclose fully all relevant facts;

(III) change in any condition that requires either a temporary or permanent reduction or elimination of the permitted discharge.

(B) To issue permits which apply, and assure compliance with, all applicable requirements of section 1318 of this title, or to inspect, monitor, enter, and require reports to at least the same extent as required in section 1318 of this title.

(C) To assure that the public, and any other State the waters of which may be affected, receive notice of each application for a permit and to provide an opportunity for public hearing before a ruling on each such application.

(D) To assure that the Administrator receives notice of each application (including a copy thereof) for a permit.

(E) To assure that any State (other than the permitting State), whose waters may be affected by the issuance of a permit may submit written recommendations to the permitting State (and the Administrator) with respect to any permit application and, if any part of such written recommendations are not accepted by the permitting State, that the permitting State will notify such affected State (and the Administrator) in writing of its failure to so accept such recommendations together with its reasons for so doing.

(F) To assure that no permit will be issued if, in the judgment of the Secretary, after consultation with the Secretary of the department in which the Coast Guard is operating, anchorage and navigation of any of the navigable waters would be substantially impaired thereby.

(G) To abate violations of the permit or the permit program, including civil and criminal penalties and other ways and means of enforcement.

(H) To assure continued coordination with Federal and Federal-State water-related planning and review processes.

(2) If, with respect to a State program submitted under subsection (g)(1) of this section, the Administrator determines that such State―

(A) has the authority set forth in paragraph (1) of this subsection, the Administrator shall approve the program and so notify

(i) such State and

(ii) the Secretary, who upon subsequent notification from such State that it is administering such program, shall suspend the issuance of permits under subsections (a) and (e) of this section for activities with respect to which a permit may be issued pursuant to such State program; or

(B) does not have the authority set forth in paragraph (1) of this subsection, the Administrator shall so notify such State, which notification shall also describe the revisions or modifications necessary so that such State may resubmit such program for a determination by the Administrator under this subsection.

(3) If the Administrator fails to make a determination with respect to any program submitted by a State under subsection (g)(1) of this section within one-hundred-twenty days after the date of the receipt of such program, such program shall be deemed approved pursuant to paragraph (2)(A) of this subsection and the Administrator shall so notify such State and the Secretary who, upon subsequent notification from such State that it is administering such program, shall suspend the issuance of permits under subsection (a) and (e) of this section for activities with respect to which a permit may be issued by such State.

(4) After the Secretary receives notification from the Administrator under paragraph (2) or (3) of this subsection that a State permit program has been approved, the Secretary shall transfer any applications for permits pending before the Secretary for activities with respect to which a permit may be issued pursuant to such State program to such State for appropriate action.

(5) Upon notification from a State with a permit program approved under this subsection that such State intends to administer and enforce the terms and conditions of a general permit issued by the Secretary under subsection (e) of this section with respect to activities in such State to which such general permit applies, the Secretary shall suspend the administration and enforcement of such general permit with respect to such activities.

(i) Withdrawal of approval

Whenever the Administrator determines after public hearing that a State is not administering a program approved under subsection (h)(2)(A) of this section, in accordance with this section, including, but not limited to, the guidelines established under subsection (b)(1) of this section, the Administrator shall so notify the State, and, if appropriate corrective action is not taken within a reasonable time, not to exceed ninety days after the date of the receipt of such notification, the Administrator shall

(1) withdraw approval of such program until the Administrator determines such corrective action has been taken, and

(2) notify the Secretary that the Secretary shall resume the program for the issuance of permits under subsections (a) and (e) of this section for activities with respect to which the State was issuing permits and that such authority of the Secretary shall continue in effect until such time as the Administrator makes the determination described in clause (1) of this subsection and such State again has an approved program.

(j) Copies of applications for State permits and proposed general permits to be transmitted to Administrator

Each State which is administering a permit program pursuant to this section shall transmit to the Administrator

(1) a copy of each permit application received by such State and provide notice to the Administrator of every action related to the consideration of such permit application, including each permit proposed to be issued by such State, and

(2) a copy of each proposed general permit which such State intends to issue. Not later than the tenth day after the date of the receipt of such permit application or such proposed general permit, the Administrator shall provide copies of such permit application or such proposed general permit to the Secretary and the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service. If the Administrator intends to provide written comments to such State with respect to such permit application or such proposed general permit, he shall so notify such State not later than the thirtieth day after the date of the receipt of such application or such proposed general permit and provide such written comments to such State, after consideration of any comments made in writing with respect to such application or such proposed general permit by the Secretary and the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service, not later than the ninetieth day after the date of such receipt. If such State is so notified by the Administrator, it shall not issue the proposed permit until after the receipt of such comments from the Administrator, or after such ninetieth day, whichever first occurs. Such State shall not issue such proposed permit after such ninetieth day if it has received such written comments in which the Administrator objects

(A) to the issuance of such proposed permit and such proposed permit is one that has been submitted to the Administrator pursuant to subsection (h)(1)(E) of this section, or

(B) to the issuance of such proposed permit as being outside the requirements of this section, including, but not limited to, the guidelines developed under subsection (b)(1) of this section unless it modifies such proposed permit in accordance with such comments. Whenever the Administrator objects to the issuance of a permit under the preceding sentence such written objection shall contain a statement of the reasons for such objection and the conditions which such permit would include if it were issued by the Administrator. In any case where the Administrator objects to the issuance of a permit, on request of the State, a public hearing shall be held by the Administrator on such objection. If the State does not resubmit such permit revised to meet such objection within 30 days after completion of the hearing or, if no hearing is requested within 90 days after the date of such objection, the Secretary may issue the permit pursuant to subsection (a) or (e) of this section, as the case may be, for such source in accordance with the guidelines and requirements of this chapter.

(k) Waiver

In accordance with guidelines promulgated pursuant to subsection (i)(2) of section 1314 of this title, the Administrator is authorized to waive the requirements of subsection (j) of this section at the time of the approval of a program pursuant to subsection (h)(2)(A) of this section for any category (including any class, type, or size within such category) of discharge within the State submitting such program.

(l) Categories of discharges not subject to requirements

The Administrator shall promulgate regulations establishing categories of discharges which he determines shall not be subject to the requirements of subsection (j) of this section in any State with a program approved pursuant to subsection (h)(2)(A) of this section. The Administrator may distinguish among classes, types, and sizes within any category of discharges.

(m) Comments on permit applications or proposed general permits by Secretary of the Interior acting through Director of United States Fish and Wildlife Service

Not later than the ninetieth day after the date on which the Secretary notifies the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service that

(1) an application for a permit under subsection (a) of this section has been received by the Secretary, or

(2) the Secretary proposes to issue a general permit under subsection (e) of this section, the Secretary of the Interior, acting through the Director of the United States Fish and Wildlife Service, shall submit any comments with respect to such application or such proposed general permit in writing to the Secretary.

(n) Enforcement authority not limited

Nothing in this section shall be construed to limit the authority of the Administrator to take action pursuant to section 1319 of this title.

(o) Public availability of permits and permit applications

A copy of each permit application and each permit issued under this section shall be available to the public. Such permit application or portion thereof, shall further be available on request for the purpose of reproduction.

(p) Compliance

Compliance with a permit issued pursuant to this section, including any activity carried out pursuant to a general permit issued under this section, shall be deemed compliance, for purposes of sections 1319 and 1365 of this title, with sections 1311, 1317, and 1343 of this title.

(q) Minimization of duplication, needless paperwork, and delays in issuance; agreements

Not later than the one-hundred-eightieth day after December 27, 1977, the Secretary shall enter into agreements with the Administrator, the Secretaries of the Departments of Agriculture, Commerce, Interior, and Transportation, and the heads of other appropriate Federal agencies to minimize, to the maximum extent practicable, duplication, needless paperwork, and delays in the issuance of permits under this section. Such agreements shall be developed to assure that, to the maximum extent practicable, a decision with respect to an application for a permit under subsection (a) of this section will be made not later than the ninetieth day after the date the notice for such application is published under subsection (a) of this section.

(r) Federal projects specifically authorized by Congress

The discharge of dredged or fill material as part of the construction of a Federal project specifically authorized by Congress, whether prior to or on or after December 27, 1977, is not prohibited by or otherwise subject to regulation under this section, or a State program approved under this section, or section 1311 (a) or 1342 of this title (except for effluent standards or prohibitions under section 1317 of this title), if information on the effects of such discharge, including consideration of the guidelines developed under subsection (b)(1) of this section, is included in an environmental impact statement for such project pursuant to the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.] and such environmental impact statement has been submitted to Congress before the actual discharge of dredged or fill material in connection with the construction of such proj­ect and prior to either authorization of such project or an appropriation of funds for such construction.

(s) Violation of permits

(1) Whenever on the basis of any information available to him the Secretary finds that any person is in violation of any condition or limitation set forth in a permit issued by the Secretary under this section, the Secretary shall issue an order requiring such person to comply with such condition or limitation, or the Secretary shall bring a civil action in accordance with paragraph (3) of this subsection.

(2) A copy of any order issued under this subsection shall be sent immediately by the Secretary to the State in which the violation occurs and other affected States. Any order issued under this subsection shall be by personal service and shall state with reasonable specificity the nature of the violation, specify a time for compliance, not to exceed thirty days, which the Secretary determines is reasonable, taking into account the seriousness of the violation and any good faith efforts to comply with applicable requirements. In any case in which an order under this subsection is issued to a corporation, a copy of such order shall be served on any appropriate corporate officers.

(3) The Secretary is authorized to commence a civil action for appropriate relief, including a permanent or temporary injunction for any violation for which he is authorized to issue a compliance order under paragraph (1) of this subsection. Any action under this paragraph may be brought in the district court of the United States for the district in which the defendant is located or resides or is doing business, and such court shall have jurisdiction to restrain such violation and to require compliance. Notice of the commencement of such acton [1] shall be given immediately to the appropriate State.

(4) Any person who violates any condition or limitation in a permit issued by the Secretary under this section, and any person who violates any order issued by the Secretary under paragraph (1) of this subsection, shall be subject to a civil penalty not to exceed $25,000 per day for each violation. In determining the amount of a civil penalty the court shall consider the seriousness of the violation or violations, the economic benefit (if any) resulting from the violation, any history of such violations, any good-faith efforts to comply with the applicable requirements, the economic impact of the penalty on the violator, and such other matters as justice may require.

(t) Navigable waters within State jurisdiction

Nothing in this section shall preclude or deny the right of any State or interstate agency to control the discharge of dredged or fill material in any portion of the navigable waters within the jurisdiction of such State, including any activity of any Federal agency, and each such agency shall comply with such State or interstate requirements both substantive and procedural to control the discharge of dredged or fill material to the same extent that any person is subject to such requirements. This section shall not be construed as affecting or impairing the authority of the Secretary to maintain navigation.

§1345. Disposal or use of sewage sludge

(a) Permit

Notwithstanding any other provision of this chapter or of any other law, in any case where the disposal of sewage sludge resulting from the operation of a treatment works as defined in section 1292 of this title (including the removal of in-place sewage sludge from one location and its deposit at another location) would result in any pollutant from such sewage sludge entering the navigable waters, such disposal is prohibited except in accordance with a permit issued by the Administrator under section 1342 of this title.

(b) Issuance of permit; regulations

The Administrator shall issue regulations governing the issuance of permits for the disposal of sewage sludge subject to subsection (a) of this section and section 1342 of this title. Such regulations shall require the application to such disposal of each criterion, factor, procedure, and requirement applicable to a permit issued under section 1342 of this title.

(c) State permit program

Each State desiring to administer its own permit program for disposal of sewage sludge subject to subsection (a) of this section within its jurisdiction may do so in accordance with section 1342 of this title.

(d) Regulations

(1) Regulations

The Administrator, after consultation with appropriate Federal and State agencies and other interested persons, shall develop and publish, within one year after December 27, 1977, and from time to time thereafter, regulations providing guidelines for the disposal of sludge and the utilization of sludge for various purposes. Such regulations shall―

(A) identify uses for sludge, including disposal;

(B) specify factors to be taken into account in determining the measures and practices applicable to each such use or disposal (including publication of information on costs);

(C) identify concentrations of pollutants which interfere with each such use or disposal.

The Administrator is authorized to revise any regulation issued under this subsection.

(2) Identification and regulation of toxic pollutants

(A) On basis of available information

(i) Proposed regulations Not later than November 30, 1986, the Administrator shall identify those toxic pollutants which, on the basis of available information on their toxicity, persistence, concentration, mobility, or potential for exposure, may be present in sewage sludge in concentrations which may adversely affect public health or the environment, and propose regulations specifying acceptable management practices for sewage sludge containing each such toxic pollutant and establishing numerical limitations for each such pollutant for each use identified under paragraph (1)(A).

(ii) Final regulations Not later than August 31, 1987, and after opportunity for public hearing, the Administrator shall promulgate the regulations required by subparagraph (A)(i).

(B) Others

(i) Proposed regulations Not later than July 31, 1987, the Administrator shall identify those toxic pollutants not identified under subparagraph (A)(i) which may be present in sewage sludge in concentrations which may adversely affect public health or the environment, and propose regulations specifying acceptable management practices for sewage sludge containing each such toxic pollutant and establishing numerical limitations for each pollutant for each such use identified under paragraph (1)(A).

(ii) Final regulations Not later than June 15, 1988, the Administrator shall promulgate the regulations required by subparagraph (B)(i).

(C) Review

From time to time, but not less often than every 2 years, the Administrator shall review the regulations promulgated under this paragraph for the purpose of identifying additional toxic pollutants and promulgating regulations for such pollutants consistent with the requirements of this paragraph.

(D) Minimum standards; compliance date

The management practices and numerical criteria established under subparagraphs (A), (B), and (C) shall be adequate to protect public health and the environment from any reasonably anticipated adverse effects of each pollutant. Such regulations shall require compliance as expeditiously as practicable but in no case later than 12 months after their publication, unless such regulations require the construction of new pollution control facilities, in which case the regulations shall require compliance as expeditiously as practicable but in no case later than two years from the date of their publication.

(3) Alternative standards

For purposes of this subsection, if, in the judgment of the Administrator, it is not feasible to prescribe or enforce a numerical limitation for a pollutant identified under paragraph (2), the Administrator may instead promulgate a design, equipment, management practice, or operational standard, or combination thereof, which in the Administrator’s judgment is adequate to protect public health and the environment from any reasonably anticipated adverse effects of such pollutant. In the event the Administrator promulgates a design or equipment standard under this subsection, the Administrator shall include as part of such standard such requirements as will assure the proper operation and maintenance of any such element of design or equipment.

(4) Conditions on permits

Prior to the promulgation of the regulations required by paragraph (2), the Administrator shall impose conditions in permits issued to publicly owned treatment works under section 1342 of this title or take such other measures as the Administrator deems appropriate to protect public health and the environment from any adverse effects which may occur from toxic pollutants in sewage sludge.

(5) Limitation on statutory construction

Nothing in this section is intended to waive more stringent requirements established by this chapter or any other law.

(e) Manner of sludge disposal

The determination of the manner of disposal or use of sludge is a local determination, except that it shall be unlawful for any person to dispose of sludge from a publicly owned treatment works or any other treatment works treating domestic sewage for any use for which regulations have been established pursuant to subsection (d) of this section, except in accordance with such regulations.

(f) Implementation of regulations

(1) Through section 1342 permits

Any permit issued under section 1342 of this title to a publicly owned treatment works or any other treatment works treating domestic sewage shall include requirements for the use and disposal of sludge that implement the regulations established pursuant to subsection (d) of this section, unless such requirements have been included in a permit issued under the appropriate provisions of subtitle C of the Solid Waste Disposal Act [42 U.S.C. 6921 et seq.], part C of the Safe Drinking Water Act [42 U.S.C. 300h et seq.], the Marine Protection, Research, and Sanctuaries Act of 1972 [16 U.S.C. 1431 et seq., 1447 et seq.; 33 U.S.C. 1401 et seq., 2801 et seq.], or the Clean Air Act [42 U.S.C. 7401 et seq.], or under State permit programs approved by the Administrator, where the Administrator determines that such programs assure compliance with any applicable requirements of this section. Not later than December 15, 1986, the Administrator shall promulgate procedures for approval of State programs pursuant to this paragraph.

(2) Through other permits

In the case of a treatment works described in paragraph (1) that is not subject to section 1342 of this title and to which none of the other above listed permit programs nor approved State permit authority apply, the Administrator may issue a permit to such treatment works solely to impose requirements for the use and disposal of sludge that implement the regulations established pursuant to subsection (d) of this section. The Administrator shall include in the permit appropriate requirements to assure compliance with the regulations established pursuant to subsection (d) of this section. The Administrator shall establish procedures for issuing permits pursuant to this paragraph.

(g) Studies and projects

(1) Grant program; information gathering

The Administrator is authorized to conduct or initiate scientific studies, demonstration projects, and public information and education projects which are designed to promote the safe and beneficial management or use of sewage sludge for such purposes as aiding the restoration of abandoned mine sites, conditioning soil for parks and recreation areas, agricultural and horticultural uses, and other beneficial purposes. For the purposes of carrying out this subsection, the Administrator may make grants to State water pollution control agencies, other public or nonprofit agencies, institutions, organizations, and individuals. In cooperation with other Federal departments and agencies, other public and private agencies, institutions, and organizations, the Administrator is authorized to collect and disseminate information pertaining to the safe and beneficial use of sewage sludge.

(2) Authorization of appropriations

For the purposes of carrying out the scientific studies, demonstration projects, and public information and education projects authorized in this section, there is authorized to be appropriated for fiscal years beginning after September 30, 1986, not to exceed $5,000,000.

§1346. Coastal recreation water quality monitoring and notification 

(a) Monitoring and notification

(1) In general

Not later than 18 months after October 10, 2000, after consultation and in cooperation with appropriate Federal, State, tribal, and local officials (including local health officials), and after providing public notice and an opportunity for comment, the Administrator shall publish performance criteria for―

(A) monitoring and assessment (including specifying available methods for monitoring) of coastal recreation waters adjacent to beaches or similar points of access that are used by the public for attainment of applicable water quality standards for pathogens and pathogen indicators; and

(B) the prompt notification of the public, local governments, and the Administrator of any exceeding of or likelihood of exceeding applicable water quality standards for coastal recreation waters described in subparagraph (A).

(2) Level of protection

The performance criteria referred to in paragraph (1) shall provide that the activities described in subparagraphs (A) and (B) of that paragraph shall be carried out as necessary for the protection of public health and safety.

(b) Program development and implementation grants

(1) In general

The Administrator may make grants to States and local governments to develop and implement programs for monitoring and notification for coastal recreation waters adjacent to beaches or similar points of access that are used by the public.

(2) Limitations

(A) In general

The Administrator may award a grant to a State or a local government to implement a monitoring and notification program if―

(i) the program is consistent with the performance criteria published by the Administrator under subsection (a) of this section;

(ii) the State or local government prioritizes the use of grant funds for particular coastal recreation waters based on the use of the water and the risk to human health presented by pathogens or pathogen indicators;

(iii) the State or local government makes available to the Administrator the factors used to prioritize the use of funds under clause (ii);

(iv) the State or local government provides a list of discrete areas of coastal recreation waters that are subject to the program for monitoring and notification for which the grant is provided that specifies any coastal recreation waters for which fiscal constraints will prevent consistency with the performance criteria under subsection (a) of this section; and

(v) the public is provided an opportunity to review the program through a process that provides for public notice and an opportunity for comment.

(B) Grants to local governments

The Administrator may make a grant to a local government under this subsection for implementation of a monitoring and notification program only if, after the 1-year period beginning on the date of publication of performance criteria under subsection (a)(1) of this section, the Administrator determines that the State is not implementing a program that meets the requirements of this subsection, regardless of whether the State has received a grant under this subsection.

(3) Other requirements

(A) Report

A State recipient of a grant under this subsection shall submit to the Administrator, in such format and at such intervals as the Administrator determines to be appropriate, a report that describes―

(i) data collected as part of the program for monitoring and notification as described in subsection (c) of this section; and

(ii) actions taken to notify the public when water quality standards are exceeded.

(B) Delegation

A State recipient of a grant under this subsection shall identify each local government to which the State has delegated or intends to delegate responsibility for implementing a monitoring and notification program consistent with the performance criteria published under subsection (a) of this section (including any coastal recreation waters for which the authority to implement a monitoring and notification program would be subject to the delegation).

(4) Federal share

(A) In general

The Administrator, through grants awarded under this section, may pay up to 100 percent of the costs of developing and implementing a program for monitoring and notification under this subsection.

(B) Non-Federal share

The non-Federal share of the costs of developing and implementing a monitoring and notification program may be―

(i) in an amount not to exceed 50 percent, as determined by the Administrator in consultation with State, tribal, and local government representatives; and

(ii) provided in cash or in kind.

(c) Content of State and local government programs

As a condition of receipt of a grant under subsection (b) of this section, a State or local government program for monitoring and notification under this section shall identify―

(1) lists of coastal recreation waters in the State, including coastal recreation waters adjacent to beaches or similar points of access that are used by the public;

(2) in the case of a State program for monitoring and notification, the process by which the State may delegate to local governments responsibility for implementing the monitoring and notification program;

(3) the frequency and location of monitoring and assessment of coastal recreation waters based on―

(A) the periods of recreational use of the waters;

(B) the nature and extent of use during certain periods;

(C) the proximity of the waters to known point sources and nonpoint sources of pollution; and

(D) any effect of storm events on the waters;

(4)

(A) the methods to be used for detecting levels of pathogens and pathogen indicators that are harmful to human health; and

(B) the assessment procedures for identifying short-term increases in pathogens and pathogen indicators that are harmful to human health in coastal recreation waters (including increases in relation to storm events);

(5) measures for prompt communication of the occurrence, nature, location, pollutants involved, and extent of any exceeding of, or likelihood of exceeding, applicable water quality standards for pathogens and pathogen indicators to―

(A) the Administrator, in such form as the Administrator determines to be appropriate; and

(B) a designated official of a local government having jurisdiction over land adjoining the coastal recreation waters for which the failure to meet applicable standards is identified;

(6) measures for the posting of signs at beaches or similar points of access, or functionally equivalent communication measures that are sufficient to give notice to the public that the coastal recreation waters are not meeting or are not expected to meet applicable water quality standards for pathogens and pathogen indicators; and

(7) measures that inform the public of the potential risks associated with water contact activities in the coastal recreation waters that do not meet applicable water quality standards.

(d) Federal agency programs

Not later than 3 years after October 10, 2000, each Federal agency that has jurisdiction over coastal recreation waters adjacent to beaches or similar points of access that are used by the public shall develop and implement, through a process that provides for public notice and an opportunity for comment, a monitoring and notification program for the coastal recreation waters that―

(1) protects the public health and safety;

(2) is consistent with the performance criteria published under subsection (a) of this section;

(3) includes a completed report on the information specified in subsection (b)(3)(A) of this section, to be submitted to the Administrator; and

(4) addresses the matters specified in subsection (c) of this section.

(e) Database

The Administrator shall establish, maintain, and make available to the public by electronic and other means a national coastal recreation water pollution occurrence database that provides―

(1) the data reported to the Administrator under subsections (b)(3)(A)(i) and (d)(3) of this section; and

(2) other information concerning pathogens and pathogen indicators in coastal recreation waters that―

(A) is made available to the Administrator by a State or local government, from a coastal water quality monitoring program of the State or local government; and

(B) the Administrator determines should be included.

(f) Technical assistance for monitoring floatable material

The Administrator shall provide technical assistance to States and local governments for the development of assessment and monitoring procedures for floatable material to protect public health and safety in coastal recreation waters.

(g) List of waters

(1) In general

Beginning not later than 18 months after the date of publication of performance criteria under subsection (a) of this section, based on information made available to the Administrator, the Administrator shall identify, and maintain a list of, discrete coastal recreation waters adjacent to beaches or similar points of access that are used by the public that―

(A) specifies any waters described in this paragraph that are subject to a monitoring and notification program consistent with the performance criteria established under subsection (a) of this section; and

(B) specifies any waters described in this paragraph for which there is no monitoring and notification program (including waters for which fiscal constraints will prevent the State or the Administrator from performing monitoring and notification consistent with the performance criteria established under subsection (a) of this section).

(2) Availability

The Administrator shall make the list described in paragraph (1) available to the public through―

(A) publication in the Federal Register; and

(B) electronic media.

(3) Updates

The Administrator shall update the list described in paragraph (1) periodically as new information becomes available.

(h) EPA implementation

In the case of a State that has no program for monitoring and notification that is consistent with the performance criteria published under subsection (a) of this section after the last day of the 3-year period beginning on the date on which the Administrator lists waters in the State under subsection (g)(1)(B) of this section, the Administrator shall conduct a monitoring and notification program for the listed waters based on a priority ranking established by the Administrator using funds appropriated for grants under subsection (i) of this section―

(1) to conduct monitoring and notification; and

(2) for related salaries, expenses, and travel.

(i) Authorization of appropriations

There is authorized to be appropriated for making grants under subsection (b) of this section, including implementation of monitoring and notification programs by the Administrator under subsection (h) of this section, $30,000,000 for each of fiscal years 2001 through 2005.